The septic was pumped and inspected. The well pump was tested as was the water and the fuel tank has been removed and the soil tested. I have to have the well treated, the electrical stuff done and decide where to have the fuel tank placed then I will be done. We still have to wait on paperwork from the DEQ so we can get that to the lender as well. My understanding is the loan has been approved and once the paperwork is to the lender we can close this deal. I am so ready!!!